Ensure both members are dry, clean, and free of wane (bark). The beam must bear fully on the post—no gaps. If a gap exists, use galvanized shims, not wood blocks.
BEAMD refers to a modular structural framing solution utilizing pre-engineered beam elements with integrated connection points. atir strap and beamd with 72 install
The BEAMD system is the primary driver for meeting the 72-hour deadline. Because the elements are prefabricated, onsite curing time is eliminated. Ensure both members are dry, clean, and free of wane (bark)