The following table provides a summary of the key features and benefits of the RSLogix 5000 81000 CPR9 W Master Disk Exclusive:
Do you have a or are you using an image (.vfd) for the Master Disk?
activation method before Rockwell Automation transitioned fully to FactoryTalk Activation. Core Specifications & Identification Release Date: CPR (Common Platform Release): Activation Type: Dual-support for EVRSI (Master Disk) FactoryTalk Activation Rockwell Automation The "Master Disk Exclusive" Significance
. It is specifically notable for being the final release to support the older EVRSI (Master Disk)
Make full backups
| Aspect | Detail | |--------|--------| | | Windows NT, 2000, XP, and (with some limitations) Windows 7 32‑bit. Not supported on 64‑bit Windows or Windows 10/11 without virtualization. | | Licensing Mechanism | Requires a physical “Master Disk” hardware key (parallel port or USB). No electronic activation. | | Current Support Status | Obsolete. Rockwell Automation ended standard support for RSLogix 500 CPR9 years ago. No security updates, driver updates, or technical support from Rockwell. | | Upgrade Path | Users can migrate to the modern RSLogix 500 Professional Edition (current version numbers > CPR 11) or the Studio 5000 Logix Designer platform (for ControlLogix/CompactLogix, but not for SLC/MicroLogix). |